Cavity Fill Below Ground Level - This area is normaly filled with a weak concrete mix (lean mix) this is to prevent this cavity void being pushed in by the internal sub-base to floor and the external ground.
If using solid blocks such as trench blocks this is not needed.
Below is a 3D image that shows Cavity Fill Below Ground Level. You can move the 3D object around with your mouse.